Streets NSTP
An NSTP Microsite
English
Publications
Malay
Publications
Saturday, 22 November 2008
Monday Tuesday Wednesday Thursday Friday Saturday

'Roads leading motorists to disaster'

Halim Said
Print Article Email Article
Road re-surfacing works in Section 19.
Road re-surfacing works in Section 19.

PETALING JAYA: Roads here may one day lead the public directly towards disaster.

That is the assessment of Kampung Tunku state assemblymen Lau Weng San, who bemoans the re-surfacing work done on Petaling Jaya roads by developers and utility companies, especially near the Rothman roundabout near Section 19.

Lau said he has received numerous complaints of shoddy work on Jalan Section 19/1 which has been re-surfaced numerous times due to utility companies constantly digging into the roads to install or repair pipes and cables.

"I just do not know why that particular road has been marked for constant road re-surfacing works. All that has put the road in a deplorable state," he said.

The assemblyman said roads stretching from Section 19/1 to 14/25 are now filled with small potholes and are uneven due to poor re-surfacing works.

"Whenever it rains, the holes turn into pools and pose a danger to motorists, especially motorcyclists," he said.

Lau said something needed to be done to curb the irregular and unplanned underground and road works in the area.

He said whenever bad road patches and shoddy re-surfacing works occur, residents point fingers at Petaling Jaya City Council (MBPJ).

"But we cannot just place the blame on MBPJ, because it's not entirely their fault. Utility companies and developers should also be responsible for maintaining road conditions," he said.

Lau said he has highlighted the matter to MBPJ, requesting stricter enforcement that ensures roads in Petaling Jaya are in good condition.

"I hope utility companies and developers will submit their rectification work plans to the council before doing any patch works. This is to ensure that MBPJ can monitor road conditions after works are completed," said Lau, adding that he will table the issue at the state assemblymen meeting.

Commenting on the matter, MBPJ public relations officer Zainun Zakaria said the council spends almost RM500,00 a year on road rectification works.

"We require a deposit for any road rectification works done by the utility company. The sum of the deposit varies from one road works to the other," she said.

Zainun said MBPJ will proceed with immediate remedial work on road surfaces, as sometimes, rectification works by utility companies or developers take almost a month to complete.



Share


MORE STORIES

On NSTOnline Today
Update Rafidah will defend No 1 post
Tan Sri Rafidah Aziz said today she will defend the Wanita Umno chief’s post in the party’s elections in March.
Shahrizat: I’m going for Wanita Umno's No 1
KUALA LUMPUR: Datuk Seri Shahrizat Abdul Jalil has decided to take up the gauntlet -- she is going for the Wanita Umno chief's post.
Chief Secretary: Complaints against civil service not cause for worry
KUCHING: The rise in complaints against the civil service "does not necessarily mean it's bad".
Dewan Rakyat: Petrol price may fall again
ANOTHER cut in petrol price -- likely next month -- is on the cards as the cost of crude oil continues to fall.

Write to the Editor for editorial enquiry or Sales Department for sales and advertising enquiry.
Copyright © 2008 NST Online. All rights reserved
Developed by Network & Multimedia Services