- Rep: Recall all ICs from Project IC
- Singapore smog breaches 'hazardous' level
- Nearly 1,000 villagers in Sibu left homeless in fire
- One of 3 HK tourists injured in KK train accident, dies
- New MERS virus spreads easily, deadlier than SARS
- Tests find no trace of body tissue from wreckage
- Baby abuse case: Yuliana was sane during incident, says report
- Britain's William and Kate do not know sex of royal baby
- 'CCTV images may yield clue on hawker's fate'
- HK tourists hurt in train vs cars crash in KK
- Paris tackles rudeness to tourists with new manual
- Baked Alaska: Unusual heat wave hits north US
- Teen country singer Bradbery captures ’The Voice’ season crown
- Health monitoring system mobilised nationwide due to haze
- France hit by weather chaos, floods claim two victims More
SINGAPORE: Singapore’s metro system has been plagued by outdated equipment and poor maintenance for years, according to a high-level inquiry that criticised the network’s operator for chasing profits.
A panel assigned to look into two breakdowns in December last year, one of which left thousands trapped for hours underground, criticised management for rushing to resume services without adequately addressing underlying problems.
The Committee of Inquiry (COI) findings, issued late Wednesday, also said publicly listed operator SMRT did not have enough engineers capable of overseeing maintenance.
“At face value, the preventive maintenance regime appeared to be robust.
The schedule for most preventive maintenance activities exceeded manufacturers’ recommendations,” the report said.
“Yet, there appeared to be a gaping disconnect between what was formally on record and what was happening on the ground,” it added.
“The COI finds the work procedures and control mechanisms of the maintenance branches to be grossly inadequate.” In December, a seven-hour breakdown affected more than 127,000 commuters, including thousands trapped in trains stalled underground after a power fault hit the SMRT network’s North-South line during the evening rush hour.
It was the worst incident in the metro system’s 24-year history, and has since been followed by several more breakdowns, including disruptions on a brand-new section that cost billions of dollars to build.
The SMRT management, which expanded retail operations at major stations in recent years, was criticised for its emphasis on resuming services after the December breakdowns, rather than addressing the problems thoroughly.
“The focus was to ensure continued revenue service,” the report said. -- AFP
